Chinese translation for "concrete diaphragm wall"
|
- 地下连续墙
Related Translations:
- Example Sentences:
| 1. | Concrete diaphragm wall is one type of underground continuous wall , which is adopted extensively in depending seepage for water conservancy and reservoir 砼防渗墙是地下连续墙的一种,在水利工程围堰防渗、水库防渗等方面广泛地采用。 | | 2. | Grabbed thin plastic concrete diaphragm wall ( abbreviated as gtdw hereinafter ) is a new technology of vertical anti - seepage developed for levee strengthening of the changjiang river 薄型抓斗塑性混凝土防渗墙技术是为适应长江堤防治理而开发的防渗新技术。 | | 3. | Gtdw , developed based on the conventional concrete diaphragm wall , has brought an important technic and economic change by decreasing its wall thickness which is now only 30 cm 与常规混凝土防渗墙相比墙体厚度仅30cm ,随着墙体厚度的变小,带来了技术和经济上的重要变化。 | | 4. | Right now , the main means to do security analyzing of concrete diaphragm wall is concrete character experiments indoors and survey on the spot . security analyzing ca n ' t do without calculating , supervising and forecasting 目前,混凝土防渗墙安全性分析的主要手段为室内砼特性试验与现场测试相结合的方法,安全性分析离不开计算、监测及预报。 | | 5. | The works included 24 bored piles of 2 . 5 meters in diameter and 55 meters in depth , 500 meters long underground concrete diaphragm wall of 0 . 8 meters thick and 25 meters deep , 450 pre - cast concrete pile of 0 . 5 meters in diameter , 12 meters deep soil excavation with multi - layer post - tensioning shoring system , reinforced concrete pile caps and basement slabs 其工程内容包括了24支直径2 . 5米,深达55米直入岩层的钻孔桩,周长500米,深度25米,厚度0 . 8米的地下连续混凝土墙, 450支直径0 . 5米预制混凝土桩, 12米深开挖,多层水平钢支撑系统,混凝土桩承台及地库底板结构。 | | 6. | This paper analyzes and explores stress strain model and principle of the project of concrete diaphragm wall after concluding other engineers and project practices and describing the seepage and deformation character of the plastic concrete used in the cofferdam of the second stage of the three gorges project . we analyze and forecast the change trend by using mathematics statistics regression , then we get the best regression equation . finished it , we used this way to the cofferdam of the second stage of the three gorges project . it proves that the method which i have introduce in this article is effective for the stability of concrete diaphragm wall and it is also a valid for supervising cofferdam security after using it in many projects 本文在总结前人和其他工程实践的基础上,结合三峡二期土石围堰实例综合分析塑性混凝土防渗墙的渗透和变形特性,对三峡二期围堰砼防渗墙的应力应变模型、原理进行了分析、探讨,在监测分析资料的基础上进行数学统计回归分析,并对变形进行预测,通过对砼防渗墙及堰体的应力应变监测数据进行数学统计回归分析,得出了最佳回归方程,并对三峡二期围堰变形进行预测,达到了对围堰安全性监测评价的最佳效果。 | | 7. | To be the wall material of gtdw , comparing with the conventional concrete diaphragm wall , plastic concrete has a much lower elastomeric modulus that approaches to that of the around soil . as a result , the deformation of the plastic concrete diaphragm wall under pressure will be similar with that of the around stratums . the stress state of the iii diaphragm wall is greatly improved and thus improvement will make it easy for the diaphragm wall to fit the stress changes by the thinner of wall or the frequent changes of the water level 塑性混凝土作为抓斗薄墙的墙体材料,相比于普通混凝土弹性模量显著降低,使其更接近于围土材料的变形模量,所以塑性混凝土防渗墙在其受力后的变形能很好地于周围地层相协调,因而能大大改善防渗墙的应力状况,更好地适应墙体变薄及长江水位频繁变化而带来的应力变化。 | | 8. | Gtdw makes a well resolution on the connection of 30cm - thickness wall by using the skill of case connecting , which is a typical character that gtdw has much more advantages than other anti - seepage techs . gtdw has learn a lot on quality checking methods and criterions from conventional concrete diaphragm wall to form it selfs reliable quality checking system and correct , simple quality criterions 抓斗薄墙采用套管连接法,很好地解决了在30cm墙厚情况下的墙段连接问题,这是抓斗薄墙优于其他防渗技术的典型特性:作为一门成熟的施工技术必须有可靠的质量检测方法和准确的便于掌握的质量标准。 | | 9. | According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads , and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall . pujialiu and yu yuzhou from water and electronic engineering of qinghua university , according to the result of three axes , define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi , yellow river accept the total stress programme of thepd dam , and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one . at same time , we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not 地下连续墙是一种历史较短的施工方法,目前,砼防渗墙的设计还是以传统的设计方法为主,根据查找国内外文献资料,华东建筑设计院王卫东利用地下连续墙与桩在竖向荷载作用下的工作性能有相似性,将适用于桩基的poulos弹性理论引入对地下连续墙的沉降计算中;清华大学水利水电工程系濮家骝、于玉贞根据三轴试验结果确定混凝土的参数,利用非线性e - b模型,结合黄河小浪底土石坝设计剖面,采用thepd土石坝总应力程序,对深覆盖层塑性混凝土防渗墙的应力、位移进行有限元分析,并与普通混凝土防渗墙计算结果加以对比,同时分析了不同配比塑性混凝土特性的影响,并采用应力水平和拉应力数值来判断塑性混凝土防渗墙的安全程度。 |
- Similar Words:
- "concrete design" Chinese translation, "concrete desintegration" Chinese translation, "concrete detail" Chinese translation, "concrete details" Chinese translation, "concrete diaphragm" Chinese translation, "concrete diaphram" Chinese translation, "concrete dike" Chinese translation, "concrete disintegration" Chinese translation, "concrete dispenser" Chinese translation, "concrete distributing tower" Chinese translation
|
|
|